RKEC Projects

RKEC Projects FCF/Deuda

El Ratio de Flujo de Caja Libre a Deuda de RKEC Projects (RKEC.NS) a fecha 25 oct 2026 es -22,93 %. En el año anterior, Ratio de Flujo de Caja Libre a Deuda era -27,47 % — un cambio del -16,52 % (superior).

FCF/Deuda

-22,93 %

YoY

-16,52%

Última actualización:

Ratio de Flujo de Caja Libre a Deuda de RKEC Projects es 2026 -22,93 % . Ratio de Flujo de Caja Libre a Deuda de RKEC Projects era 2025 -27,47 % . Disminuye un -16,52% superior en comparación con el año anterior.

La RKEC Projects FCF/Deuda Historia

  • 3 años

  • 10 años

  • 25 Años

  • Máximo

FCF/Deuda
Fecha
FCF/Deuda
1 ene 2019
-23,52 INR
1 ene 2020
13,91 INR
1 ene 2021
-57,15 INR
1 ene 2022
7,37 INR
1 ene 2023
-9,23 INR
1 ene 2024
-1,31 INR
1 ene 2025
-27,47 INR
1 ene 2026
-22,93 INR
La RKEC Projects FCF/Deuda Historia
AÑOFCF/DeudaYoY
-22,93 %-16,52%
-27,47 %+1991,48%
-1,31 %-85,77%
-9,23 %-225,25%
7,37 %-112,89%
-57,15 %-510,76%
13,91 %-159,16%
-23,52 %-88,08%
-197,27 %-146,25%
426,57 %+167,48%
159,48 %-247,63%
-108,03 %-4408,29%
2,51 %—

Accede a estos datos a través de la API de Eulerpool

100.000 solicitudes/mes gratis · sin tarjeta

RKEC Projects Análisis de acciones

¿Qué hace RKEC Projects? RKEC Projects Ltd. provides civil and defence construction services across India, specializing in bridges, ports, dams, high-rise structures, airports, and infrastructure projects including roads, highways, and oil and gas pipelines. The company designs and constructs jetties, berths, wharves, and intake works, with a focus on major and minor bridges. Its building and infrastructure services cover civil works for power and refinery projects, port development, transmission lines, sports complexes, water intake systems, and heavy roller compacted concrete (RCC) structures. Electrification services include rural electrification and low-tension (LT)/hyper high tension (HT) works. The company serves government and public sector entities through civil and defence construction contracts, including infrastructure development for power, refinery, and port sectors. It targets projects requiring specialized engineering solutions such as major bridges, water intake systems, and heavy RCC structures. The firm’s services are delivered across India, focusing on large-scale infrastructure and defence-related construction needs. RKEC Projects Ltd. generates revenue through construction contracts for civil and defence infrastructure, including bridges, ports, dams, and power projects. Its electrification services for rural areas and high-tension electrical works contribute to its income stream. The company’s specialized focus on heavy roller compacted concrete (RCC) and pre-stressed concrete structures supports its positioning in high-demand infrastructure segments. RKEC Projects es una de las empresas más populares en Eulerpool.

Preguntas frecuentes sobre la acción RKEC Projects

Ratio de Flujo de Caja Libre a Deuda de RKEC Projects es -22,93 % en 2026.

Ratio de Flujo de Caja Libre a Deuda de RKEC Projects cambió de -27,47 % a -22,93 %, lo que representa un cambio del -16,52 %. El valor es superior que el año anterior.

En Eulerpool puedes encontrar el desarrollo histórico completo de RKEC Projects de Ratio de Flujo de Caja Libre a Deuda desde 2006 – con valores anuales, gráficos y análisis detallado.

FCL/Deuda mide el porcentaje de deuda total que podría ser reembolsado a partir del flujo de caja libre. Es una medida más estricta que FCO/Deuda ya que contabiliza los gastos de capital.

Un 'bueno' varía según la industria y la fase de la empresa. En Eulerpool, puede comparar RKEC Projects de Ratio de Flujo de Caja Libre a Deuda con empresas del sector y el promedio de la industria para evaluar si es atractivo.

Accede a estos datos a través de la API de Eulerpool

100.000 solicitudes/mes gratis · sin tarjeta

Apalancamiento — RKEC Projects

Todas las Métricas Clave — RKEC Projects