Transport Engineering Design

Transport Engineering Design SG&A Expenses

The Selling, General & Administrative Expenses of Transport Engineering Design (TED.VN) as of Nov 18, 2026 is 220.01 B VND. In the previous year, Selling, General & Administrative Expenses was 242.85 B VND — a change of -9.41% (lower).

SG&A Expenses

220.01 BVND

YoY

-9.41%

Last updated:

Selling, General & Administrative Expenses of Transport Engineering Design is 2024 220.01 B VND. Selling, General & Administrative Expenses of Transport Engineering Design was 2023 242.85 B VND. It decreases by -9.41% lower compared to the previous year.

The Transport Engineering Design SG&A Expenses history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

SG&A Expenses
Date
SG&A Expenses
Jan 1, 2020
136.94 B VND
Jan 1, 2021
138.13 B VND
Jan 1, 2022
199.28 B VND
Jan 1, 2023
242.85 B VND
Jan 1, 2024
220.01 B VND
The Transport Engineering Design SG&A Expenses history
YEARSG&A ExpensesYoY
220.01 BVND-9.41%
242.85 BVND+21.86%
199.28 BVND+44.27%
138.13 BVND+0.87%
136.94 BVND—

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Transport Engineering Design Stock analysis

What does Transport Engineering Design do? Transport Engineering Design Inc, headquartered in Hanoi, Vietnam, provides comprehensive engineering services including transportation, industrial, and residential project planning, technical design, and construction quality monitoring. Listed on May 10, 2022, the company specializes in preparing construction investment reports, project management, and technical assessments for infrastructure development in Vietnam. Transport Engineering Design is one of the most popular companies on Eulerpool.

Frequently Asked Questions about Transport Engineering Design stock

Selling, General & Administrative Expenses of Transport Engineering Design is 220.01 B VND in 2024.

Selling, General & Administrative Expenses of Transport Engineering Design changed from 242.85 B VND to 220.01 B VND, representing a -9.41% change. The value is lower than the previous year.

On Eulerpool you can find the complete historical development of Selling, General & Administrative Expenses Transport Engineering Design since 2006 – with annual values, charts, and detailed analysis.

SG&A expenses include all non-production costs such as salaries, marketing, rent, and administrative overhead. They are a key component of operating expenses.

Selling, General & Administrative Expenses's VND is a key factor for investors. Changes in this metric can signal improving or deteriorating fundamentals, directly impacting the stock price. On Eulerpool, you can track Selling, General & Administrative Expenses's Transport Engineering Design historically and in real time.

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Income Statement — Transport Engineering Design

All Key Metrics — Transport Engineering Design