Transport Engineering Design

Transport Engineering Design Property, Plant & Equipment

The Property, Plant & Equipment (PP&E) of Transport Engineering Design (TED.VN) as of Oct 31, 2026 is 73.37 B VND. In the previous year, Property, Plant & Equipment (PP&E) was 72.44 B VND — a change of 1.28% (higher).

Property, Plant & Equipment

73.37 BVND

YoY

1.28%

Last updated:

Property, Plant & Equipment (PP&E) of Transport Engineering Design is 2024 73.37 B VND. Property, Plant & Equipment (PP&E) of Transport Engineering Design was 2023 72.44 B VND. It decreases by 1.28% higher compared to the previous year.

The Transport Engineering Design Property, Plant & Equipment history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

Property, Plant & Equipment
Date
Property, Plant & Equipment
Jan 1, 2020
67.93 B VND
Jan 1, 2021
68.06 B VND
Jan 1, 2022
69.81 B VND
Jan 1, 2023
72.44 B VND
Jan 1, 2024
73.37 B VND
The Transport Engineering Design Property, Plant & Equipment history
YEARProperty, Plant & EquipmentYoY
73.37 BVND+1.28%
72.44 BVND+3.77%
69.81 BVND+2.57%
68.06 BVND+0.19%
67.93 BVND—

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Transport Engineering Design Stock analysis

What does Transport Engineering Design do? Transport Engineering Design Inc, headquartered in Hanoi, Vietnam, provides comprehensive engineering services including transportation, industrial, and residential project planning, technical design, and construction quality monitoring. Listed on May 10, 2022, the company specializes in preparing construction investment reports, project management, and technical assessments for infrastructure development in Vietnam. Transport Engineering Design is one of the most popular companies on Eulerpool.

Frequently Asked Questions about Transport Engineering Design stock

Property, Plant & Equipment (PP&E) of Transport Engineering Design is 73.37 B VND in 2024.

Property, Plant & Equipment (PP&E) of Transport Engineering Design changed from 72.44 B VND to 73.37 B VND, representing a 1.28% change. The value is higher than the previous year.

On Eulerpool you can find the complete historical development of Property, Plant & Equipment (PP&E) Transport Engineering Design since 2006 – with annual values, charts, and detailed analysis.

PP&E represents the physical assets used in operations, such as buildings, machinery, and equipment. It is the backbone of manufacturing and service delivery.

Property, Plant & Equipment (PP&E)'s VND is a key factor for investors. Changes in this metric can signal improving or deteriorating fundamentals, directly impacting the stock price. On Eulerpool, you can track Property, Plant & Equipment (PP&E)'s Transport Engineering Design historically and in real time.

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Balance Sheet — Transport Engineering Design

All Key Metrics — Transport Engineering Design