Kinetic Engineering

Kinetic Engineering Intangible Assets

The Intangible Assets of Kinetic Engineering (500240.BO) as of Oct 22, 2026 is 3.91 M INR. In the previous year, Intangible Assets was 2.03 M INR — a change of 92.43% (higher).

Intangible Assets

3.91 MINR

YoY

92.43%

Last updated:

Intangible Assets of Kinetic Engineering is 2025 3.91 M INR. Intangible Assets of Kinetic Engineering was 2024 2.03 M INR. It decreases by 92.43% higher compared to the previous year.

The Kinetic Engineering Intangible Assets history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

Intangible Assets
Date
Intangible Assets
Jan 1, 2018
872,000.00 INR
Jan 1, 2019
827,000.00 INR
Jan 1, 2020
312,000.00 INR
Jan 1, 2021
348,000.00 INR
Jan 1, 2022
352,000.00 INR
Jan 1, 2023
2.50 M INR
Jan 1, 2024
2.03 M INR
Jan 1, 2025
3.91 M INR
The Kinetic Engineering Intangible Assets history
YEARIntangible AssetsYoY
3.91 MINR+92.43%
2.03 MINR-18.64%
2.50 MINR+610.23%
352,000.00INR+1.15%
348,000.00INR+11.54%
312,000.00INR-62.27%
827,000.00INR-5.16%
872,000.00INR-30.68%
1.26 MINR—
0.00INR—
0.00INR—

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Kinetic Engineering Stock analysis

What does Kinetic Engineering do? Kinetic Engineering Ltd. generates revenue through the manufacturing and supply of automotive components, including transmission parts like gears, shafts, and axles, as well as engine components such as crankshafts and cylinder heads. The company provides complete gearbox and engine assemblies for both automotive and non-automotive applications, alongside body components like chassis, rims, and mufflers. Services such as press shop, weld shop, and paint shop support its production processes, while small engine assembly up to 400 ccs caters to diverse market needs. Its facilities include gear and shaft manufacturing, aluminum and cast iron machining, and transmission assembly with quality testing, serving domestic and international customers. The firm's product portfolio targets automotive manufacturers and suppliers requiring transmission, engine, and body components, with a focus on high-quality manufacturing capabilities. Its facilities enable comprehensive production from raw material processing to final assembly, including multi-facility heat treatment for enhanced product durability. International and domestic market segments benefit from Kinetic Engineering's integrated manufacturing solutions, which streamline supply chains for clients in the automotive sector. Kinetic Engineering Ltd. serves automotive and non-automotive industries through its transmission, engine, and body component offerings, with a strong emphasis on assembly and testing capabilities. The company's ability to produce small engines up to 400 ccs expands its market reach, while its specialized facilities for machining and heat treatment ensure precision and reliability in component manufacturing. Domestic and international clients rely on the firm's end-to-end production services to meet their automotive component demands. Kinetic Engineering is one of the most popular companies on Eulerpool.

Frequently Asked Questions about Kinetic Engineering stock

Intangible Assets of Kinetic Engineering is 3.91 M INR in 2025.

Intangible Assets of Kinetic Engineering changed from 2.03 M INR to 3.91 M INR, representing a 92.43% change. The value is higher than the previous year.

On Eulerpool you can find the complete historical development of Intangible Assets Kinetic Engineering since 2006 – with annual values, charts, and detailed analysis.

Intangible assets are non-physical assets such as patents, trademarks, copyrights, and software. They can be significant value drivers for technology and pharmaceutical companies.

Intangible Assets's INR is a key factor for investors. Changes in this metric can signal improving or deteriorating fundamentals, directly impacting the stock price. On Eulerpool, you can track Intangible Assets's Kinetic Engineering historically and in real time.

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Balance Sheet — Kinetic Engineering

All Key Metrics — Kinetic Engineering