Smart Powerr

Smart Powerr PP&E per Employee

The PP&E per Employee of Smart Powerr (CREG) as of Oct 19, 2026 is 6,285.32 USD. In the previous year, PP&E per Employee was 1.31 M USD — a change of -99.52% (lower).

PP&E per Employee

6,285.32USD

YoY

-99.52%

Last updated:

PP&E per Employee of Smart Powerr is 2021 6,285.32 USD. PP&E per Employee of Smart Powerr was 2020 1.31 M USD. It decreases by -99.52% lower compared to the previous year.

The Smart Powerr PP&E per Employee history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

PP&E per Employee
Date
PP&E per Employee
Jan 1, 2014
7.02 M USD
Jan 1, 2015
5.25 M USD
Jan 1, 2016
3.93 M USD
Jan 1, 2017
4.33 M USD
Jan 1, 2018
3.19 M USD
Jan 1, 2019
2.31 M USD
Jan 1, 2020
1.31 M USD
Jan 1, 2021
6,285.32 USD
The Smart Powerr PP&E per Employee history
YEARPP&E per EmployeeYoY
6,285.32USD-99.52%
1.31 MUSD-43.15%
2.31 MUSD-27.41%
3.19 MUSD-26.37%
4.33 MUSD+10.02%
3.93 MUSD-25.13%
5.25 MUSD-25.15%
7.02 MUSD—

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Smart Powerr Stock analysis

What does Smart Powerr do? Smart Powerr Corp, with ticker CREG and ISIN US1689134088, is a company based in Xi'an, China, operating in the Industrials sector within the Commercial Services & Supplies industry. The company has 22 employees and went public on March 22, 2010. Its website is http://www.creg-cn.com. Smart Powerr Corp focuses on energy-saving technologies, particularly in waste energy recycling systems for industrial applications. The company provides solutions for iron and steel, nonferrous metal, cement, coal, and petrochemical plants. Its waste pressure-to-energy solution involves the blast furnace top gas recovery turbine unit (TRT), which captures high-pressure gas from blast furnace tops to drive turbines and generate electricity. The waste heat-to-energy solution includes heat power generation projects that collect residual heat from manufacturing processes, such as the entrance and exit ends of cement rotary kilns, to produce electricity. Additionally, the company offers waste gas-to-energy solutions featuring the Waste Gas Power Generation system (WGPG) and the Combined Cycle Power Plant (CCPP). The company's headquarters is located in Xi'an, Shaanxi, and it operates with a relatively small workforce of 22 employees. Its IPO date is March 22, 2010, and it maintains an online presence through its website. The company's services are designed to enhance energy efficiency and sustainability in heavy industrial sectors. Smart Powerr is one of the most popular companies on Eulerpool.

Frequently Asked Questions about Smart Powerr stock

PP&E per Employee of Smart Powerr is 6,285.32 USD in 2021.

PP&E per Employee of Smart Powerr changed from 1.31 M USD to 6,285.32 USD, representing a -99.52% change. The value is lower than the previous year.

On Eulerpool you can find the complete historical development of PP&E per Employee Smart Powerr since 2006 – with annual values, charts, and detailed analysis.

PP&E per employee measures the physical capital intensity per worker. Higher values indicate more capital-intensive operations.

PP&E per Employee's USD is a key factor for investors. Changes in this metric can signal improving or deteriorating fundamentals, directly impacting the stock price. On Eulerpool, you can track PP&E per Employee's Smart Powerr historically and in real time.

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Workforce — Smart Powerr

All Key Metrics — Smart Powerr