Point Engineering Co

Point Engineering Co SG&A Expenses

The Selling, General & Administrative Expenses of Point Engineering Co (256630.KQ) as of Nov 3, 2026 is 2.18 B KRW. In the previous year, Selling, General & Administrative Expenses was 1.97 B KRW — a change of 10.78% (higher).

SG&A Expenses

2.18 BKRW

YoY

10.78%

Last updated:

Selling, General & Administrative Expenses of Point Engineering Co is 2025 2.18 B KRW. Selling, General & Administrative Expenses of Point Engineering Co was 2024 1.97 B KRW. It decreases by 10.78% higher compared to the previous year.

The Point Engineering Co SG&A Expenses history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

SG&A Expenses
Date
SG&A Expenses
Jan 1, 2018
40.00 M KRW
Jan 1, 2019
6.88 B KRW
Jan 1, 2020
7.18 B KRW
Jan 1, 2021
6.54 B KRW
Jan 1, 2022
2.31 B KRW
Jan 1, 2023
2.28 B KRW
Jan 1, 2024
1.97 B KRW
Jan 1, 2025
2.18 B KRW
The Point Engineering Co SG&A Expenses history
YEARSG&A ExpensesYoY
2.18 BKRW+10.78%
1.97 BKRW-13.76%
2.28 BKRW-1.24%
2.31 BKRW-64.67%
6.54 BKRW-8.89%
7.18 BKRW+4.39%
6.88 BKRW+17,095.00%
40.00 MKRW+2.56%
39.00 MKRW+160.00%
15.00 MKRW—

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Point Engineering Co Stock analysis

What does Point Engineering Co do? Point Engineering Co Ltd, based in Asan, South Korea, operates in the Information Technology sector, specializing in semiconductors. The company manufactures and distributes semiconductor and liquid crystal display components, including temperature controlled heaters, gas homogenizers, and glass fixtures. Listed on May 2, 2017, it serves the technology industry with its specialized products. Point Engineering Co is one of the most popular companies on Eulerpool.

Frequently Asked Questions about Point Engineering Co stock

Selling, General & Administrative Expenses of Point Engineering Co is 2.18 B KRW in 2025.

Selling, General & Administrative Expenses of Point Engineering Co changed from 1.97 B KRW to 2.18 B KRW, representing a 10.78% change. The value is higher than the previous year.

On Eulerpool you can find the complete historical development of Selling, General & Administrative Expenses Point Engineering Co since 2006 – with annual values, charts, and detailed analysis.

SG&A expenses include all non-production costs such as salaries, marketing, rent, and administrative overhead. They are a key component of operating expenses.

Selling, General & Administrative Expenses's KRW is a key factor for investors. Changes in this metric can signal improving or deteriorating fundamentals, directly impacting the stock price. On Eulerpool, you can track Selling, General & Administrative Expenses's Point Engineering Co historically and in real time.

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Income Statement — Point Engineering Co

All Key Metrics — Point Engineering Co