K&R Rail Engineering Stock

K&R Rail Engineering Inventory

The Inventory of K&R Rail Engineering (514360.BO) as of Aug 13, 2026 is 416.10 M INR. In the previous year, Inventory was 352.62 M INR — a change of 18.00% (higher).

Inventory

416.10 MINR

YoY

18.00%

Last updated:

Inventory of K&R Rail Engineering is 2026 416.10 M INR. Inventory of K&R Rail Engineering was 2025 352.62 M INR. It decreases by 18.00% higher compared to the previous year.
Access this data via the Eulerpool API

K&R Rail Engineering Stock analysis

What does K&R Rail Engineering do? K&R Rail Engineering is one of the most popular companies on Eulerpool.

Frequently Asked Questions about K&R Rail Engineering stock

Inventory of K&R Rail Engineering is 416.10 M INR in 2026.

Inventory of K&R Rail Engineering changed from 352.62 M INR to 416.10 M INR, representing a 18.00% change. The value is higher than the previous year.

On Eulerpool you can find the complete historical development of Inventory K&R Rail Engineering since 2006 – with annual values, charts, and detailed analysis.

Inventory includes raw materials, work-in-progress, and finished goods. Efficient inventory management is crucial for profitability.

Inventory's INR is a key factor for investors. Changes in this metric can signal improving or deteriorating fundamentals, directly impacting the stock price. On Eulerpool, you can track Inventory's K&R Rail Engineering historically and in real time.

Access this data via the Eulerpool API

Balance Sheet — K&R Rail Engineering

All Key Metrics — K&R Rail Engineering