K&R Rail Engineering Stock

K&R Rail Engineering Financial Leverage

The Financial Leverage (Equity Multiplier) of K&R Rail Engineering (514360.BO) as of Aug 25, 2026 is 2.82. In the previous year, Financial Leverage (Equity Multiplier) was 2.93 — a change of -3.89% (lower).

Financial Leverage

2.82

YoY

-3.89%

Last updated:

Financial Leverage (Equity Multiplier) of K&R Rail Engineering is 2026 2.82 . Financial Leverage (Equity Multiplier) of K&R Rail Engineering was 2025 2.93 . It decreases by -3.89% lower compared to the previous year.

The K&R Rail Engineering Financial Leverage history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

Financial Leverage
Date
Financial Leverage
Jan 1, 2018
2.78 INR
Jan 1, 2019
1.53 INR
Jan 1, 2020
2.13 INR
Jan 1, 2021
1.97 INR
Jan 1, 2022
1.86 INR
Jan 1, 2023
1.88 INR
Jan 1, 2024
2.93 INR
Jan 1, 2025
2.82 INR
The K&R Rail Engineering Financial Leverage history
YEARFinancial LeverageYoY
2.82-3.89%
2.93+56.40%
1.88+0.75%
1.86-5.40%
1.97-7.77%
2.13+39.58%
1.53-45.03%
2.78
Access this data via the Eulerpool API

K&R Rail Engineering Stock analysis

What does K&R Rail Engineering do? K&R Rail Engineering is one of the most popular companies on Eulerpool.

Frequently Asked Questions about K&R Rail Engineering stock

Financial Leverage (Equity Multiplier) of K&R Rail Engineering is 2.82 in 2026.

Financial Leverage (Equity Multiplier) of K&R Rail Engineering changed from 2.93 to 2.82, representing a -3.89% change. The value is lower than the previous year.

On Eulerpool you can find the complete historical development of Financial Leverage (Equity Multiplier) K&R Rail Engineering since 2006 – with annual values, charts, and detailed analysis.

Financial leverage, also known as the equity multiplier, measures total assets relative to equity. Higher leverage amplifies both returns and risks.

A 'good' varies by industry and company stage. On Eulerpool, you can compare Financial Leverage (Equity Multiplier)'s K&R Rail Engineering with sector peers and the industry average to assess whether it is attractive.

Access this data via the Eulerpool API

Leverage — K&R Rail Engineering

All Key Metrics — K&R Rail Engineering