Consultancy Design and Urban Development JSC

Consultancy Design and Urban Development JSC Operating Expenses

The Total Operating Expenses of Consultancy Design and Urban Development JSC (CDO.VN) as of Nov 3, 2026 is 4.18 B VND. In the previous year, Total Operating Expenses was 3.75 B VND — a change of 11.67% (higher).

Operating Expenses

4.18 BVND

YoY

11.67%

Last updated:

Total Operating Expenses of Consultancy Design and Urban Development JSC is 2024 4.18 B VND. Total Operating Expenses of Consultancy Design and Urban Development JSC was 2023 3.75 B VND. It decreases by 11.67% higher compared to the previous year.

The Consultancy Design and Urban Development JSC Operating Expenses history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

Operating Expenses
Date
Operating Expenses
Jan 1, 2017
3.61 B VND
Jan 1, 2018
6.76 B VND
Jan 1, 2019
24.23 B VND
Jan 1, 2020
3.17 B VND
Jan 1, 2021
2.86 B VND
Jan 1, 2022
3.17 B VND
Jan 1, 2023
3.75 B VND
Jan 1, 2024
4.18 B VND
The Consultancy Design and Urban Development JSC Operating Expenses history
YEAROperating ExpensesYoY
4.18 BVND+11.67%
3.75 BVND+18.11%
3.17 BVND+11.10%
2.86 BVND-9.94%
3.17 BVND-86.92%
24.23 BVND+258.65%
6.76 BVND+87.07%
3.61 BVND-5.74%
3.83 BVND-8.70%
4.20 BVND-1.82%
4.27 BVND—

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Consultancy Design and Urban Development JSC Stock analysis

What does Consultancy Design and Urban Development JSC do? Consultancy Design and Urban Development JSC is one of the most popular companies on Eulerpool.

Frequently Asked Questions about Consultancy Design and Urban Development JSC stock

Total Operating Expenses of Consultancy Design and Urban Development JSC is 4.18 B VND in 2024.

Total Operating Expenses of Consultancy Design and Urban Development JSC changed from 3.75 B VND to 4.18 B VND, representing a 11.67% change. The value is higher than the previous year.

On Eulerpool you can find the complete historical development of Total Operating Expenses Consultancy Design and Urban Development JSC since 2006 – with annual values, charts, and detailed analysis.

Operating expenses are the costs incurred in the normal course of business operations, including COGS, SG&A, R&D, and depreciation.

Total Operating Expenses's VND is a key factor for investors. Changes in this metric can signal improving or deteriorating fundamentals, directly impacting the stock price. On Eulerpool, you can track Total Operating Expenses's Consultancy Design and Urban Development JSC historically and in real time.

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Income Statement — Consultancy Design and Urban Development JSC

All Key Metrics — Consultancy Design and Urban Development JSC