Consultancy Design and Urban Development JSC

Consultancy Design and Urban Development JSC Interest Expense

The Interest Expense of Consultancy Design and Urban Development JSC (CDO.VN) as of Oct 31, 2026 is 265.54 M VND. In the previous year, Interest Expense was -8.05 B VND — a change of -103.30% (higher).

Interest Expense

265.54 MVND

YoY

-103.30%

Last updated:

Interest Expense of Consultancy Design and Urban Development JSC is 2024 265.54 M VND. Interest Expense of Consultancy Design and Urban Development JSC was 2023 -8.05 B VND. It decreases by -103.30% higher compared to the previous year.

The Consultancy Design and Urban Development JSC Interest Expense history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

Interest Expense
Date
Interest Expense
Jan 1, 2017
75.00 M VND
Jan 1, 2018
-1.32 B VND
Jan 1, 2019
61.00 M VND
Jan 1, 2020
-3.56 B VND
Jan 1, 2021
-10.68 B VND
Jan 1, 2022
-21.02 B VND
Jan 1, 2023
-8.05 B VND
Jan 1, 2024
265.54 M VND
The Consultancy Design and Urban Development JSC Interest Expense history
YEARInterest ExpenseYoY
265.54 MVND-103.30%
-8.05 BVND-61.67%
-21.02 BVND+96.87%
-10.68 BVND+199.86%
-3.56 BVND-5,936.07%
61.00 MVND-104.63%
-1.32 BVND-1,856.00%
75.00 MVND+3,650.00%
2.00 MVND-101.05%
-190.00 MVND—
0.00VND—

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Consultancy Design and Urban Development JSC Stock analysis

What does Consultancy Design and Urban Development JSC do? Consultancy Design and Urban Development JSC is one of the most popular companies on Eulerpool.

Frequently Asked Questions about Consultancy Design and Urban Development JSC stock

Interest Expense of Consultancy Design and Urban Development JSC is 265.54 M VND in 2024.

Interest Expense of Consultancy Design and Urban Development JSC changed from -8.05 B VND to 265.54 M VND, representing a -103.30% change. The value is higher than the previous year.

On Eulerpool you can find the complete historical development of Interest Expense Consultancy Design and Urban Development JSC since 2006 – with annual values, charts, and detailed analysis.

Interest expense represents the cost of borrowing. Higher interest expenses can indicate a highly leveraged company.

Interest Expense's VND is a key factor for investors. Changes in this metric can signal improving or deteriorating fundamentals, directly impacting the stock price. On Eulerpool, you can track Interest Expense's Consultancy Design and Urban Development JSC historically and in real time.

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Income Statement — Consultancy Design and Urban Development JSC

All Key Metrics — Consultancy Design and Urban Development JSC