Sebo Manufacturing Engineering Construction

Sebo Manufacturing Engineering Construction Operating Expenses

The Total Operating Expenses of Sebo Manufacturing Engineering Construction (011560.KQ) as of Nov 26, 2026 is 3.04 B KRW. In the previous year, Total Operating Expenses was 17.99 B KRW — a change of -83.12% (lower).

Operating Expenses

3.04 BKRW

YoY

-83.12%

Last updated:

Total Operating Expenses of Sebo Manufacturing Engineering Construction is 2025 3.04 B KRW. Total Operating Expenses of Sebo Manufacturing Engineering Construction was 2024 17.99 B KRW. It decreases by -83.12% lower compared to the previous year.

The Sebo Manufacturing Engineering Construction Operating Expenses history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

Operating Expenses
Date
Operating Expenses
Jan 1, 2018
13.10 B KRW
Jan 1, 2019
10.05 B KRW
Jan 1, 2020
10.00 B KRW
Jan 1, 2021
12.95 B KRW
Jan 1, 2022
22.55 B KRW
Jan 1, 2023
16.26 B KRW
Jan 1, 2024
17.99 B KRW
Jan 1, 2025
3.04 B KRW
The Sebo Manufacturing Engineering Construction Operating Expenses history
YEAROperating ExpensesYoY
3.04 BKRW-83.12%
17.99 BKRW+10.67%
16.26 BKRW-27.92%
22.55 BKRW+74.15%
12.95 BKRW+29.50%
10.00 BKRW-0.51%
10.05 BKRW-23.28%
13.10 BKRW-3.83%
13.62 BKRW+4.47%
13.04 BKRW+29.40%
10.08 BKRW+15.10%
8.76 BKRW—

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Sebo Manufacturing Engineering Construction Stock analysis

What does Sebo Manufacturing Engineering Construction do? SEBO MANUFACTURING, ENGINEERING & CONSTRUCTION Corp. generates revenue through construction services and machinery installation across various sectors. The company operates five divisions: the construction facilities division builds air conditioning, fire protection, and piping systems for office buildings, apartments, residential complexes, and department stores; the high technology facilities division constructs clean rooms for semiconductor, LCD, PDP, LED, and mobile phone manufacturing; the plant equipment division handles LNG piping, district heating, nuclear power plants, and fuel tank facilities; the overseas division manages facilities and plant projects in Vietnam, Philippines, and India; and the manufacture division supports production activities. Clients include commercial real estate developers, technology manufacturers, and international infrastructure projects. The high technology facilities division serves semiconductor, LCD, PDP, LED, and mobile phone industries by providing clean room construction. The plant equipment division targets energy and industrial sectors with LNG piping, district heating, and nuclear power plant installations. Overseas projects in Vietnam, Philippines, and India drive international revenue streams. Construction facilities division clients range from residential complexes to department stores requiring HVAC and fire safety systems. Sebo Manufacturing Engineering Construction is one of the most popular companies on Eulerpool.

Frequently Asked Questions about Sebo Manufacturing Engineering Construction stock

Total Operating Expenses of Sebo Manufacturing Engineering Construction is 3.04 B KRW in 2025.

Total Operating Expenses of Sebo Manufacturing Engineering Construction changed from 17.99 B KRW to 3.04 B KRW, representing a -83.12% change. The value is lower than the previous year.

On Eulerpool you can find the complete historical development of Total Operating Expenses Sebo Manufacturing Engineering Construction since 2006 – with annual values, charts, and detailed analysis.

Operating expenses are the costs incurred in the normal course of business operations, including COGS, SG&A, R&D, and depreciation.

Total Operating Expenses's KRW is a key factor for investors. Changes in this metric can signal improving or deteriorating fundamentals, directly impacting the stock price. On Eulerpool, you can track Total Operating Expenses's Sebo Manufacturing Engineering Construction historically and in real time.

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Income Statement — Sebo Manufacturing Engineering Construction

All Key Metrics — Sebo Manufacturing Engineering Construction