Repower Energy Development

Repower Energy Development Long-term Debt

The Long-Term Debt of Repower Energy Development (REDC.PM) as of Nov 25, 2026 is 2.53 B PHP. In the previous year, Long-Term Debt was 1.67 B PHP — a change of 51.39% (higher).

Long-term Debt

2.53 BPHP

YoY

51.39%

Last updated:

Long-Term Debt of Repower Energy Development is 2024 2.53 B PHP. Long-Term Debt of Repower Energy Development was 2023 1.67 B PHP. It decreases by 51.39% higher compared to the previous year.

The Repower Energy Development Long-term Debt history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

Long-term Debt
Date
Long-term Debt
Jan 1, 2021
1.35 B PHP
Jan 1, 2022
1.32 B PHP
Jan 1, 2023
1.67 B PHP
Jan 1, 2024
2.53 B PHP
The Repower Energy Development Long-term Debt history
YEARLong-term DebtYoY
2.53 BPHP+51.39%
1.67 BPHP+26.44%
1.32 BPHP-2.48%
1.35 BPHP—

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Repower Energy Development Stock analysis

What does Repower Energy Development do? Repower Energy Development Corp generates revenue through the operation of run-of-river hydropower plants across the Philippines, primarily in Luzon, Visayas, and Mindanao regions. The company operates six existing plants including Balugbog MHP, Palakpakin MHP, Calibato MHP, Majayjay MHP, Upper Labayat MHP, and Inarihan MHP with a total capacity of 10.146 MW, while two additional plants Lower Labayat MHP and Tibag MHP are under construction. Revenue is derived from electricity sales to the grid through its subsidiaries such as Philippine Power and Development Company (PPDC), Majayjay Hydropower Company, Inc. (MHCI), and Labayat 1 Hydropower Corporation (L1HC), which manage the generation and distribution infrastructure. The company serves the renewable energy generation segment targeting utility-scale electricity consumers within the Philippine power market. Its subsidiaries, including Cabanglasan Hydropower Corporation (CHC), Bicol Hydropower Corporation (BHC), and Piapi Hydropower Corporation, support the operational structure by managing specific regional projects. Revenue streams are based on power generation output from the hydropower facilities across all three island regions. Repower Energy Development Corp's business model relies on long-term power purchase agreements with the grid operator, leveraging its portfolio of hydropower assets to supply consistent renewable energy. The company focuses on maintaining and expanding its operational capacity through the completion of under-construction plants, which will increase its total generating capacity beyond the current 10.146 MW. Repower Energy Development is one of the most popular companies on Eulerpool.

Frequently Asked Questions about Repower Energy Development stock

Long-Term Debt of Repower Energy Development is 2.53 B PHP in 2024.

Long-Term Debt of Repower Energy Development changed from 1.67 B PHP to 2.53 B PHP, representing a 51.39% change. The value is higher than the previous year.

On Eulerpool you can find the complete historical development of Long-Term Debt Repower Energy Development since 2006 – with annual values, charts, and detailed analysis.

Long-term debt represents obligations due after one year. It is a key component of a company's capital structure and leverage.

Long-Term Debt's PHP is a key factor for investors. Changes in this metric can signal improving or deteriorating fundamentals, directly impacting the stock price. On Eulerpool, you can track Long-Term Debt's Repower Energy Development historically and in real time.

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Balance Sheet — Repower Energy Development

All Key Metrics — Repower Energy Development