RKEC Projects

RKEC Projects Rule of 40

The Rule of 40 of RKEC Projects (RKEC.NS) as of Nov 24, 2026 is -72.99 %. In the previous year, Rule of 40 was 29.70 % — a change of -345.79% (lower).

Rule of 40

-72.99 %

YoY

-345.79%

Last updated:

Rule of 40 of RKEC Projects is 2026 -72.99 % . Rule of 40 of RKEC Projects was 2025 29.70 % . It decreases by -345.79% lower compared to the previous year.

The RKEC Projects Rule of 40 history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

Rule of 40
Date
Rule of 40
Jan 1, 2019
12.37 INR
Jan 1, 2020
55.10 INR
Jan 1, 2021
-15.14 INR
Jan 1, 2022
19.06 INR
Jan 1, 2023
42.18 INR
Jan 1, 2024
47.58 INR
Jan 1, 2025
29.70 INR
Jan 1, 2026
-72.99 INR
The RKEC Projects Rule of 40 history
YEARRule of 40YoY
-72.99 %-345.79%
29.70 %-37.58%
47.58 %+12.79%
42.18 %+121.37%
19.06 %-225.89%
-15.14 %-127.47%
55.10 %+345.35%
12.37 %-66.73%
37.18 %-56.47%
85.40 %+34.44%
63.52 %+126.81%
28.01 %—

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

RKEC Projects Stock analysis

What does RKEC Projects do? RKEC Projects Ltd. provides civil and defence construction services across India, specializing in bridges, ports, dams, high-rise structures, airports, and infrastructure projects including roads, highways, and oil and gas pipelines. The company designs and constructs jetties, berths, wharves, and intake works, with a focus on major and minor bridges. Its building and infrastructure services cover civil works for power and refinery projects, port development, transmission lines, sports complexes, water intake systems, and heavy roller compacted concrete (RCC) structures. Electrification services include rural electrification and low-tension (LT)/hyper high tension (HT) works. The company serves government and public sector entities through civil and defence construction contracts, including infrastructure development for power, refinery, and port sectors. It targets projects requiring specialized engineering solutions such as major bridges, water intake systems, and heavy RCC structures. The firm’s services are delivered across India, focusing on large-scale infrastructure and defence-related construction needs. RKEC Projects Ltd. generates revenue through construction contracts for civil and defence infrastructure, including bridges, ports, dams, and power projects. Its electrification services for rural areas and high-tension electrical works contribute to its income stream. The company’s specialized focus on heavy roller compacted concrete (RCC) and pre-stressed concrete structures supports its positioning in high-demand infrastructure segments. RKEC Projects is one of the most popular companies on Eulerpool.

Frequently Asked Questions about RKEC Projects stock

Rule of 40 of RKEC Projects is -72.99 % in 2026.

On Eulerpool you can find the complete historical development of Rule of 40 RKEC Projects since 2006 – with annual values, charts, and detailed analysis.

The Rule of 40 states that a company's revenue growth rate plus profit margin should exceed 40%. It is widely used to evaluate SaaS and high-growth companies.

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Quality — RKEC Projects

All Key Metrics — RKEC Projects