Power Engineering Consulting JSC 4

Power Engineering Consulting JSC 4 Current Liabilities

The Current Liabilities of Power Engineering Consulting JSC 4 (TV4.VN) as of Nov 1, 2026 is 109.79 B VND. In the previous year, Current Liabilities was 114.93 B VND — a change of -4.47% (lower).

Current Liabilities

109.79 BVND

YoY

-4.47%

Last updated:

Current Liabilities of Power Engineering Consulting JSC 4 is 2024 109.79 B VND. Current Liabilities of Power Engineering Consulting JSC 4 was 2023 114.93 B VND. It decreases by -4.47% lower compared to the previous year.

The Power Engineering Consulting JSC 4 Current Liabilities history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

Current Liabilities
Date
Current Liabilities
Jan 1, 2017
78.36 B VND
Jan 1, 2018
85.61 B VND
Jan 1, 2019
116.13 B VND
Jan 1, 2020
150.06 B VND
Jan 1, 2021
136.44 B VND
Jan 1, 2022
150.62 B VND
Jan 1, 2023
114.93 B VND
Jan 1, 2024
109.79 B VND
The Power Engineering Consulting JSC 4 Current Liabilities history
YEARCurrent LiabilitiesYoY
109.79 BVND-4.47%
114.93 BVND-23.69%
150.62 BVND+10.40%
136.44 BVND-9.08%
150.06 BVND+29.22%
116.13 BVND+35.64%
85.61 BVND+9.25%
78.36 BVND+3.04%
76.05 BVND+32.35%
57.47 BVND-33.05%
85.84 BVND-7.20%
92.50 BVND-14.47%
108.14 BVND+28.06%
84.45 BVND-35.98%
131.90 BVND+67.77%
78.62 BVND+25.45%
62.67 BVND+51.76%
41.30 BVND+28.52%
32.13 BVND-19.88%
40.11 BVND+67.42%
23.96 BVND—

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Power Engineering Consulting JSC 4 Stock analysis

What does Power Engineering Consulting JSC 4 do? Power Engineering Consulting JSC 4 provides consultancy services for power plant development and construction, focusing on electricity infrastructure, power plants, and power grids. The company offers architectural design, construction consultancy, and specialized services including mapping, surveying, building inspection, environment testing, site supervision, and geotechnical services for projects up to 500 kilovolts and 1200 megawatts hydropower. It also engages in electricity generation and merchandise of electricity equipment. The firm serves clients in the energy sector requiring power infrastructure development, including utilities and government entities managing power grids and transmission lines. Its services target projects involving high-voltage transmission systems and large-scale hydropower facilities, with a focus on technical consultancy and project execution support. Revenue streams include consultancy fees for design and construction services, project management for high-voltage infrastructure, and sales of electricity equipment. The company's merchandise of electricity equipment complements its consultancy offerings, providing integrated solutions for clients in the power sector. Power Engineering Consulting JSC 4 is one of the most popular companies on Eulerpool.

Frequently Asked Questions about Power Engineering Consulting JSC 4 stock

Current Liabilities of Power Engineering Consulting JSC 4 is 109.79 B VND in 2024.

Current Liabilities of Power Engineering Consulting JSC 4 changed from 114.93 B VND to 109.79 B VND, representing a -4.47% change. The value is lower than the previous year.

On Eulerpool you can find the complete historical development of Current Liabilities Power Engineering Consulting JSC 4 since 2006 – with annual values, charts, and detailed analysis.

Current liabilities are obligations due within one year, including accounts payable, short-term debt, and accrued expenses.

Current Liabilities's VND is a key factor for investors. Changes in this metric can signal improving or deteriorating fundamentals, directly impacting the stock price. On Eulerpool, you can track Current Liabilities's Power Engineering Consulting JSC 4 historically and in real time.

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Balance Sheet — Power Engineering Consulting JSC 4

All Key Metrics — Power Engineering Consulting JSC 4