Perfect Infraengineers

Perfect Infraengineers Long-term Debt

The Long-Term Debt of Perfect Infraengineers (PERFECT.NS) as of Nov 25, 2026 is 45.00 M INR. In the previous year, Long-Term Debt was 59.38 M INR — a change of -24.21% (lower).

Long-term Debt

45.00 MINR

YoY

-24.21%

Last updated:

Long-Term Debt of Perfect Infraengineers is 2024 45.00 M INR. Long-Term Debt of Perfect Infraengineers was 2023 59.38 M INR. It decreases by -24.21% lower compared to the previous year.

The Perfect Infraengineers Long-term Debt history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

Long-term Debt
Date
Long-term Debt
Jan 1, 2021
46.20 M INR
Jan 1, 2022
39.43 M INR
Jan 1, 2023
59.38 M INR
Jan 1, 2024
45.00 M INR
The Perfect Infraengineers Long-term Debt history
YEARLong-term DebtYoY
45.00 MINR-24.21%
59.38 MINR+50.57%
39.43 MINR-14.65%
46.20 MINR—

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Perfect Infraengineers Stock analysis

What does Perfect Infraengineers do? Perfect Infraengineers Ltd manufactures HVAC components, equipment, and provides MEP contracting services. The company integrates its solar thermal panel system with commercial and industrial HVAC systems to boost efficiency by capturing energy and reducing mechanical energy needs. Its renewable hybrid technology combines high-efficiency air conditioners with variable speed or two-stage systems, using a panel to act as a compressor booster. The firm targets government, private, and international bodies for its HTS panel solutions. The company’s solar thermal panel system is designed for integration with HVAC systems, allowing the compressor to unload while the panel functions as a booster. This technology replaces mechanical energy with modulated thermal energy, saving electricity. Perfect Infraengineers Ltd offers these solutions for residential and commercial air conditioning and heating applications. The firm has tested its HTS panels globally across various government, private, and third-party bodies. Perfect Infraengineers Ltd focuses on selling its solar thermal panel system and renewable hybrid technology to commercial and industrial clients seeking energy-efficient HVAC solutions. The company’s products are integrated into existing HVAC systems to improve efficiency without requiring full system replacements. Its target segments include government bodies, private companies, and international organizations that require sustainable heating and cooling solutions. Perfect Infraengineers is one of the most popular companies on Eulerpool.

Frequently Asked Questions about Perfect Infraengineers stock

Long-Term Debt of Perfect Infraengineers is 45.00 M INR in 2024.

Long-Term Debt of Perfect Infraengineers changed from 59.38 M INR to 45.00 M INR, representing a -24.21% change. The value is lower than the previous year.

On Eulerpool you can find the complete historical development of Long-Term Debt Perfect Infraengineers since 2006 – with annual values, charts, and detailed analysis.

Long-term debt represents obligations due after one year. It is a key component of a company's capital structure and leverage.

Long-Term Debt's INR is a key factor for investors. Changes in this metric can signal improving or deteriorating fundamentals, directly impacting the stock price. On Eulerpool, you can track Long-Term Debt's Perfect Infraengineers historically and in real time.

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Balance Sheet — Perfect Infraengineers

All Key Metrics — Perfect Infraengineers