HEC Infra Projects

HEC Infra Projects FCF Yield

The Free Cash Flow Yield of HEC Infra Projects (HECPROJECT.NS) as of Oct 26, 2026 is 0.11 %. In the previous year, Free Cash Flow Yield was -21.63 % — a change of -100.49% (higher).

FCF Yield

0.11 %

YoY

-100.49%

Last updated:

Free Cash Flow Yield of HEC Infra Projects is 2026 0.11 % . Free Cash Flow Yield of HEC Infra Projects was 2025 -21.63 % . It decreases by -100.49% higher compared to the previous year.

The HEC Infra Projects FCF Yield history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

FCF Yield
Date
FCF Yield
Jan 1, 2019
-3.46 INR
Jan 1, 2020
-3.99 INR
Jan 1, 2021
1.18 INR
Jan 1, 2022
-3.03 INR
Jan 1, 2023
5.64 INR
Jan 1, 2024
5.85 INR
Jan 1, 2025
-21.63 INR
Jan 1, 2026
0.11 INR
The HEC Infra Projects FCF Yield history
YEARFCF YieldYoY
0.11 %-100.49%
-21.63 %-469.96%
5.85 %+3.66%
5.64 %-286.27%
-3.03 %-356.32%
1.18 %-129.60%
-3.99 %+15.24%
-3.46 %+106.31%
-1.68 %-118.88%
8.89 %-695.66%
-1.49 %-131.10%
4.80 %+36.67%
3.51 %—

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

HEC Infra Projects Stock analysis

What does HEC Infra Projects do? HEC Infra Projects Ltd provides engineering, procurement, and construction services for electro-mechanical projects. The company delivers end-to-end solutions including design, supply, installation, and commissioning for overhead transmission lines, substations, underground cable laying, switchyards, water pumping stations, lighting systems, industrial and commercial electrification, solar photovoltaic plants, extra low voltage systems, battery energy storage systems, and mini/micro grid solar projects. Its clients include steel, chemical, cement, refinery, petrochemical, gas and oil sector, textile, pharmaceutical, power-generation plants, ports, commercial centers, banks, malls, multiplexes, call centers, software parks, and special economic zones. The firm generates revenue through integrated engineering, procurement, and construction services for electro-mechanical infrastructure projects. It serves clients across multiple industries requiring electrical and electro-mechanical solutions, including industrial facilities, power generation, and commercial developments. The company’s service portfolio focuses on delivering comprehensive solutions for clients in sectors such as steel, chemical, cement, and power generation. HEC Infra Projects Ltd operates as an electrical and electro-mechanical contractor for clients and consultants. It offers specialized services for projects requiring expertise in electrical systems, including solar PV plants, battery energy storage systems, and mini/micro grid solar projects. The company’s business model centers on providing full-cycle project execution, from design through commissioning, for clients in diverse industrial and commercial sectors. HEC Infra Projects is one of the most popular companies on Eulerpool.

Frequently Asked Questions about HEC Infra Projects stock

Free Cash Flow Yield of HEC Infra Projects is 0.11 % in 2026.

Free Cash Flow Yield of HEC Infra Projects changed from -21.63 % to 0.11 %, representing a -100.49% change. The value is higher than the previous year.

On Eulerpool you can find the complete historical development of Free Cash Flow Yield HEC Infra Projects since 2006 – with annual values, charts, and detailed analysis.

FCF Yield measures the free cash flow per share relative to the stock price. It indicates how much cash a company generates for each dollar invested.

To evaluate Free Cash Flow Yield's, it is essential to compare it with peers in the same industry and sector. On Eulerpool, you can find direct industry comparisons for Free Cash Flow Yield.

A 'good' varies by industry and company stage. On Eulerpool, you can compare Free Cash Flow Yield's HEC Infra Projects with sector peers and the industry average to assess whether it is attractive.

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Valuation — HEC Infra Projects

All Key Metrics — HEC Infra Projects