Expo Engineering and Projects

Expo Engineering and Projects Financial Leverage

The Financial Leverage (Equity Multiplier) of Expo Engineering and Projects (526614.BO) as of Oct 22, 2026 is 2.57. In the previous year, Financial Leverage (Equity Multiplier) was 3.72 — a change of -30.84% (lower).

Financial Leverage

2.57

YoY

-30.84%

Last updated:

Financial Leverage (Equity Multiplier) of Expo Engineering and Projects is 2025 2.57 . Financial Leverage (Equity Multiplier) of Expo Engineering and Projects was 2024 3.72 . It decreases by -30.84% lower compared to the previous year.

The Expo Engineering and Projects Financial Leverage history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

Financial Leverage
Date
Financial Leverage
Jan 1, 2016
2.63 INR
Jan 1, 2017
2.56 INR
Jan 1, 2020
3.16 INR
Jan 1, 2021
3.45 INR
Jan 1, 2022
3.60 INR
Jan 1, 2023
3.93 INR
Jan 1, 2024
3.72 INR
Jan 1, 2025
2.57 INR
The Expo Engineering and Projects Financial Leverage history
YEARFinancial LeverageYoY
2.57-30.84%
3.72-5.40%
3.93+9.16%
3.60+4.58%
3.45+8.90%
3.16+23.58%
2.56-2.75%
2.63+7.03%
2.46+2.11%
2.41—

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Expo Engineering and Projects Stock analysis

What does Expo Engineering and Projects do? Expo Gas Containers Ltd. generates revenue by manufacturing process plant equipment and executing site engineering projects. The company produces a variety of industrial assets including coded pressure vessels, deaerators, distillation columns, towers, reactors, heat exchangers, and liquefiable gas cylinders. Additionally, the firm undertakes turnkey projects to construct fixed and floating roof tanks, mounded storage tanks, Horton spheres, and cryogenic tanks, while also handling cross country and in-plant piping. The company sells its products and services to the oil, gas, petrochemical, fertilizer, and steel industries. Its service offerings encompass the supply of heat exchangers and columns, as well as the installation of column trays, internals, and piping-inside battery limits. Expo Gas Containers Ltd. operates as the parent company of Expo Project Engineering Services Pvt. Ltd., which supports its engineering and construction capabilities. Expo Engineering and Projects is one of the most popular companies on Eulerpool.

Frequently Asked Questions about Expo Engineering and Projects stock

Financial Leverage (Equity Multiplier) of Expo Engineering and Projects is 2.57 in 2025.

Financial Leverage (Equity Multiplier) of Expo Engineering and Projects changed from 3.72 to 2.57, representing a -30.84% change. The value is lower than the previous year.

On Eulerpool you can find the complete historical development of Financial Leverage (Equity Multiplier) Expo Engineering and Projects since 2006 – with annual values, charts, and detailed analysis.

Financial leverage, also known as the equity multiplier, measures total assets relative to equity. Higher leverage amplifies both returns and risks.

A 'good' varies by industry and company stage. On Eulerpool, you can compare Financial Leverage (Equity Multiplier)'s Expo Engineering and Projects with sector peers and the industry average to assess whether it is attractive.

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Leverage — Expo Engineering and Projects

All Key Metrics — Expo Engineering and Projects