Elspec Engineering Stock

Elspec Engineering Capital Expenditures

The Capital Expenditures (CapEx) of Elspec Engineering (ELSPC.TA) as of Aug 7, 2026 is -4.57 M ILS. In the previous year, Capital Expenditures (CapEx) was -5.08 M ILS — a change of -10.01% (higher).

Capital Expenditures

-4.57 MILS

YoY

-10.01%

Last updated:

Capital Expenditures (CapEx) of Elspec Engineering is 2026 -4.57 M ILS. Capital Expenditures (CapEx) of Elspec Engineering was 2025 -5.08 M ILS. It decreases by -10.01% higher compared to the previous year.
Access this data via the Eulerpool API

Elspec Engineering Stock analysis

What does Elspec Engineering do? Elspec Engineering is one of the most popular companies on Eulerpool.

Frequently Asked Questions about Elspec Engineering stock

Capital Expenditures (CapEx) of Elspec Engineering is -4.57 M ILS in 2026.

Capital Expenditures (CapEx) of Elspec Engineering changed from -5.08 M ILS to -4.57 M ILS, representing a -10.01% change. The value is higher than the previous year.

On Eulerpool you can find the complete historical development of Capital Expenditures (CapEx) Elspec Engineering since 2006 – with annual values, charts, and detailed analysis.

Capital expenditures represent investments in long-term assets such as property, equipment, and technology. CapEx is essential for maintaining and growing the business.

Capital Expenditures (CapEx)'s ILS is a key factor for investors. Changes in this metric can signal improving or deteriorating fundamentals, directly impacting the stock price. On Eulerpool, you can track Capital Expenditures (CapEx)'s Elspec Engineering historically and in real time.

Access this data via the Eulerpool API

Cash Flow — Elspec Engineering

All Key Metrics — Elspec Engineering