BC Power Controls

BC Power Controls Payables Turnover

The Payables Turnover Ratio of BC Power Controls (537766.BO) as of Nov 11, 2026 is 218.54. In the previous year, Payables Turnover Ratio was 42.19 — a change of 417.97% (higher).

Payables Turnover

218.54

YoY

417.97%

Last updated:

Payables Turnover Ratio of BC Power Controls is 2025 218.54 . Payables Turnover Ratio of BC Power Controls was 2024 42.19 . It decreases by 417.97% higher compared to the previous year.

The BC Power Controls Payables Turnover history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

Payables Turnover
Date
Payables Turnover
Jan 1, 2017
7.66 INR
Jan 1, 2018
3.32 INR
Jan 1, 2019
15.90 INR
Jan 1, 2020
9.71 INR
Jan 1, 2021
222.85 INR
Jan 1, 2022
31.92 INR
Jan 1, 2023
42.19 INR
Jan 1, 2025
218.54 INR
The BC Power Controls Payables Turnover history
YEARPayables TurnoverYoY
218.54+417.97%
42.19+32.17%
31.92-85.68%
222.85+2,194.47%
9.71-38.92%
15.90+379.37%
3.32-56.69%
7.66-14.44%
8.95+36.79%
6.54+91.31%
3.42—

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

BC Power Controls Stock analysis

What does BC Power Controls do? B.C.Power Controls Ltd. generates revenue through the manufacturing and trading of electronic products, primarily focusing on cables and wires. The company produces armored cables such as Armoured Cable 1 through 5, unarmored cable including Unarmoured Cable 1, flexible and house wires like Single Core PVC Insulated Copper Conductor (Unsheathed), and specialized cables including submersible Three Core Flat PVC Insulated Flexible Industrial Cable and instrumentation cables Instrumentation Cable 1 and 2. These products are sold to industrial and construction sectors requiring electrical wiring solutions. The manufacturing unit in E-424, RIICO industrial area, Bhiwadi, supports production for domestic and international markets. Power Controls Limited, operating under the same entity, trades cables including armored and unarmored types, flexible and house wires, and submersible cables. The company’s product portfolio targets infrastructure development, electrical installations, and industrial applications. Customers include construction firms, electrical contractors, and manufacturing units requiring reliable wiring systems. The company’s focus on diverse cable types ensures steady demand across multiple segments of the electrical industry. The company’s revenue streams are derived from the sale of its extensive cable range, with armored and instrumentation cables forming key product categories. Manufacturing in Rajasthan enables cost-effective production, while the product names and specifications directly reflect customer requirements for safety and durability. Sales are driven by the growing infrastructure needs in India, particularly in the electrical and construction sectors, where the company’s specialized cables meet specific technical demands. BC Power Controls is one of the most popular companies on Eulerpool.

Frequently Asked Questions about BC Power Controls stock

Payables Turnover Ratio of BC Power Controls is 218.54 in 2025.

Payables Turnover Ratio of BC Power Controls changed from 42.19 to 218.54, representing a 417.97% change. The value is higher than the previous year.

On Eulerpool you can find the complete historical development of Payables Turnover Ratio BC Power Controls since 2006 – with annual values, charts, and detailed analysis.

Payables turnover measures how quickly a company pays its suppliers. Lower turnover may indicate better payment terms or cash flow management.

A 'good' varies by industry and company stage. On Eulerpool, you can compare Payables Turnover Ratio's BC Power Controls with sector peers and the industry average to assess whether it is attractive.

To evaluate Payables Turnover Ratio's, it is essential to compare it with peers in the same industry and sector. On Eulerpool, you can find direct industry comparisons for Payables Turnover Ratio.

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Profitability — BC Power Controls

All Key Metrics — BC Power Controls