ARSS Infrastructure Projects

ARSS Infrastructure Projects Diluted EPS

The Diluted Earnings per Share of ARSS Infrastructure Projects (ARSSINFRA.NS) as of Oct 15, 2026 is -6.41 INR. In the previous year, Diluted Earnings per Share was -28.75 INR — a change of -77.71% (higher).

Diluted EPS

-6.41INR

YoY

-77.71%

Last updated:

Diluted Earnings per Share of ARSS Infrastructure Projects is 2025 -6.41 INR. Diluted Earnings per Share of ARSS Infrastructure Projects was 2024 -28.75 INR. It decreases by -77.71% higher compared to the previous year.

The ARSS Infrastructure Projects Diluted EPS history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

Diluted EPS
Date
Diluted EPS
Jan 1, 2018
-29.20 INR
Jan 1, 2019
-5.13 INR
Jan 1, 2020
3.47 INR
Jan 1, 2021
-22.60 INR
Jan 1, 2022
-48.00 INR
Jan 1, 2023
4.88 INR
Jan 1, 2024
-28.75 INR
Jan 1, 2025
-6.41 INR
The ARSS Infrastructure Projects Diluted EPS history
YEARDiluted EPSYoY
-6.41INR-77.71%
-28.75INR-688.89%
4.88INR-110.17%
-48.00INR+112.39%
-22.60INR-751.30%
3.47INR-167.64%
-5.13INR-82.43%
-29.20INR-86.83%
-221.73INR-10,317.97%
2.17INR-12.50%
2.48INR+121.43%
1.12INR—

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

ARSS Infrastructure Projects Stock analysis

What does ARSS Infrastructure Projects do? ARSS Infrastructure Projects Ltd, listed on the National Stock Exchange of India under the ticker ARSSINFRA.NS, is a construction company headquartered in New Delhi, India. The company went public through an IPO on March 3, 2010. It operates within the Industrials sector, specifically in the Construction industry. ARSS Infrastructure Projects Ltd employs 774 people and maintains a corporate website at http://www.arssgroup.in/. The company provides construction services across various project types, including railway projects, road projects, urban projects, marine projects, power projects, bridge projects, and irrigation projects. Its railway projects involve surveying, alignment planning, and designing road and railway infrastructure, including embankments, cuttings, and on-site flash butt welding for long rails. The firm constructs diverse bridge types such as concrete deck bridges, prestressed concrete (PSC) bridges, and steel girder bridges, utilizing various foundation methods like open, well, and pile foundations. Urban infrastructure projects encompass drinking water systems, sanitation, sewage networks, urban transport solutions, primary health services, and environmental regulation. The company has one subsidiary, ARSS Damoh Hirapur Tolls Private Limited. ARSS Infrastructure Projects Ltd focuses on delivering infrastructure solutions across multiple sectors, emphasizing technical execution in civil engineering and construction. ARSS Infrastructure Projects is one of the most popular companies on Eulerpool.

Frequently Asked Questions about ARSS Infrastructure Projects stock

Diluted Earnings per Share of ARSS Infrastructure Projects is -6.41 INR in 2025.

Diluted Earnings per Share of ARSS Infrastructure Projects changed from -28.75 INR to -6.41 INR, representing a -77.71% change. The value is higher than the previous year.

On Eulerpool you can find the complete historical development of Diluted Earnings per Share ARSS Infrastructure Projects since 2006 – with annual values, charts, and detailed analysis.

Diluted EPS accounts for all potential shares from options, warrants, and convertible securities. It provides a more conservative per-share earnings measure.

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Income Statement — ARSS Infrastructure Projects

All Key Metrics — ARSS Infrastructure Projects