AJAX Engineering

AJAX Engineering SG&A Expenses

The Selling, General & Administrative Expenses of AJAX Engineering (AJAXENGG.NS) as of Nov 27, 2026 is 621.03 M INR. In the previous year, Selling, General & Administrative Expenses was 1.11 B INR — a change of -44.30% (lower).

SG&A Expenses

621.03 MINR

YoY

-44.30%

Last updated:

Selling, General & Administrative Expenses of AJAX Engineering is 2026 621.03 M INR. Selling, General & Administrative Expenses of AJAX Engineering was 2025 1.11 B INR. It decreases by -44.30% lower compared to the previous year.

The AJAX Engineering SG&A Expenses history

  • 3 Years

  • 10 Years

  • 25 Years

  • Max

SG&A Expenses
Date
SG&A Expenses
Jan 1, 2019
586.81 M INR
Jan 1, 2020
563.67 M INR
Jan 1, 2021
617.15 M INR
Jan 1, 2022
43.02 M INR
Jan 1, 2023
45.80 M INR
Jan 1, 2024
106.37 M INR
Jan 1, 2025
1.11 B INR
Jan 1, 2026
621.03 M INR
The AJAX Engineering SG&A Expenses history
YEARSG&A ExpensesYoY
621.03 MINR-44.30%
1.11 BINR+948.12%
106.37 MINR+132.25%
45.80 MINR+6.46%
43.02 MINR-93.03%
617.15 MINR+9.49%
563.67 MINR-3.94%
586.81 MINR—

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

AJAX Engineering Stock analysis

What does AJAX Engineering do? Ajax Engineering Ltd. generates revenue through the manufacturing and supply of self-loading mobile concrete mixers, concrete batching plants, and dumper placers. The company's product portfolio includes self-loading concrete mixers (SLCMs), batching plants, transit mixers, boom pumps, concrete pumps, self-propelled boom pumps, slip-form pavers, and 3D concrete printers. It also provides spare parts and after-sales service through dealers. The firm targets construction sectors requiring concrete mixing, transportation, and placement solutions, with products like ARGO 2000DM and ARGO 4000DM tunnel dumpers and various pavers. Customers include construction companies and infrastructure developers seeking equipment for concrete production and placement. The company's revenue streams come from direct sales of equipment such as SLCMs, batching plants, and boom pumps, alongside spare parts and after-sales service. Its tunnel dumpers ARGO 2000DM and ARGO 4000DM are key products for specialized construction applications. The firm's solutions cater to sectors using concrete for infrastructure projects, with a focus on equipment that supports efficient concrete mixing, transportation, and placement processes. Dealers play a role in facilitating after-sales service, enhancing customer support for the company's product range. Ajax Engineering Ltd. serves construction and infrastructure development segments requiring concrete mixing and placement equipment. Its product range includes transit mixers for concrete transportation, slip-form pavers for paving, and 3D concrete printers for innovative construction methods. The company's offerings address needs for reliable equipment in concrete production and placement, with ARGO 2000DM and ARGO 4000DM tunnel dumpers being specific models for tunnel construction applications. The firm's focus on both standard and advanced concrete solutions ensures a broad market reach within the construction industry. AJAX Engineering is one of the most popular companies on Eulerpool.

Frequently Asked Questions about AJAX Engineering stock

Selling, General & Administrative Expenses of AJAX Engineering is 621.03 M INR in 2026.

Selling, General & Administrative Expenses of AJAX Engineering changed from 1.11 B INR to 621.03 M INR, representing a -44.30% change. The value is lower than the previous year.

On Eulerpool you can find the complete historical development of Selling, General & Administrative Expenses AJAX Engineering since 2006 – with annual values, charts, and detailed analysis.

SG&A expenses include all non-production costs such as salaries, marketing, rent, and administrative overhead. They are a key component of operating expenses.

Selling, General & Administrative Expenses's INR is a key factor for investors. Changes in this metric can signal improving or deteriorating fundamentals, directly impacting the stock price. On Eulerpool, you can track Selling, General & Administrative Expenses's AJAX Engineering historically and in real time.

Access this data via the Eulerpool API

100,000 free requests/mo · no credit card

Income Statement — AJAX Engineering

All Key Metrics — AJAX Engineering